Conference Agenda
Session | ||
B5-2: Experience with fully digital PACS
Session Topics: B5 Protection and automation
| ||
Presentations | ||
4:00pm - 4:15pm
Experiences in the commissioning of IEC 61850 digital busbar protection systems. 1GE VERNOVA, Canada; 2Engie Energia Peru; 3Luz del Sur, S.A.A. 4:15pm - 4:30pm
Two real cases of IEC-61850 user-profile implementation that improves sustainability while cutting project-times and costs: Enel Colombia (utility) and ISA (TSO). 1Ingenieros Emetres, Americas and Colombia; 2Enel Colombia 4:30pm - 4:45pm
Implementation of Non-Conventional Protection Automation and Control Schemes and IEC61850 communication System in the Expansion of a 500kV/138kV Substation for Transmission-Generation Application EPCOR, Canada 4:45pm - 5:00pm
Secondary Injection Testing in Merging Units Considering Low Power Instrument Transformer Technology 1SecuControl Inc, United States of America; 2Conprove Engenharia, Brazil 5:00pm - 5:15pm
Challenges and their remedies for integration of edition-2 IEDs with lower edition SAS for health monitoring of grid assets. Power Grid Corporation of India Limited, India 5:15pm - 5:30pm
Future of Digital Substations: An Analysis from Conventional Systems to Centralized Protection and Virtualized PAC for Scalability and Efficiency 1Independent consultant; 2Universidad Nacional de Colombia, Colombia; 3Enterprise Innovation; 4IM3 - Ingenieros Emetres 5:30pm - 5:45pm
FLISR and IEC 61850 GOOSE communications over an LTE/5G network using QoS and IP/MPLS: Meeting latency requirements for protection in the electrical distribution grid Nokia, United States of America 5:45pm - 6:00pm
Integrating PTP for IEC 61850 Process Bus Applications with Multi-Vendor Ethernet Switches 1EPCOR; 2Hitachi Energy |