CIGRE 2025 International Symposium
Palais des Congrès de Montréal, Québec, Canada
From September 29 to October 2, 2025
Conference Agenda
Overview and details of the sessions of this conference. Please select a date or location to show only sessions at that day or location. Please select a single session for detailed view (with abstracts and downloads if available).
|
Session Overview |
| Session | ||||||||||
B3-5: EHV & UHV AC and DC Substation Topics
Session Topics: B3 Substations and electrical installations
| ||||||||||
| Presentations | ||||||||||
10:30am - 10:45am
Development of 1,000 kV Substation Equipment and Technological Advancements in Japan through Demonstration and Verification Test 1TEPCO Power Grid, Inc., Japan; 2Toshiba energy systems & solutions Co.; 3The Institute of Electrical Engineers of Japan; 4Mitsubishi Electric Corporation; 5NGK INSULATORS, LTD.
10:45am - 11:00am
Challenge of High Ground Potential Rise in Transmission Substations having High Ground Fault Levels and Solving Approach Hydro One Networks Inc., Canada
11:00am - 11:15am
Auxiliary Power System Design Approach for HVDC Converter Stations AtkinsRealis, Canada 11:15am - 11:30am
Design concepts for compact air insulated substations 1Cardiff University, United Kingdom; 2National Grid, United Kingdom
11:30am - 11:45am
Substation EHV/HV transformer circuit layout optimized for lightning protection National Transmission Company South Africa, South Africa
11:45am - 12:00pm
Predictive Power Flow Simulator for SCADA Systems—A Real-World Implementation Schweitzer Engineering Laboratories, Inc., United States of America
12:00pm - 12:15pm
Off-Load Bus Splitter arrangement in 400 kV Double Main Bus Bar Scheme to mitigate complete disruption of power supply during breakdown/repair Power Grid Corporation of India Ltd., India
| ||||||||||

