B3-4: Substation Concepts
Session Topics: B3 Substations and electrical installations
| ||
Presentations | ||
4:00pm - 4:15pm
Experience of designing high voltage substation in hilly terrain at high altitude, cold temperature, and steep slope for evacuating power from hydro electric projects on hills for enhancing non-fossil fuel energy capacity of Indian electricity grid POWER GRID CORPORATION OF INDIA LTD, India 4:15pm - 4:30pm
New Aspects of 420 kV GIS on-site Testing and PD Monitoring and Diagnostics 1Darmstadt University of Technology, Germany; 2Graz University of Technology, Austria 4:30pm - 4:45pm
SF6-free Offshore GIS Substation with High-Power GIB crossing Fire-Resistant Sections 1GE Vernova, Gas Insulated Substations, Grid Solutions, Oberentfelden Switzerland; 2GE Vernova, Grid Solutions, Suzhou China 4:45pm - 5:00pm
Standardisation of SF6-free 245kV and 420kV GIS for multiple gas solutions 1GE Vernova, France; 2RTE, France 5:00pm - 5:15pm
Bay extension challenges and strategies for seamless Integration in India’s Renewable Energy substations Power Grid Corporation of India Ltd., India 5:15pm - 5:30pm
Enhancing Resilience with Mobile Substations: Lessons from TEİAŞ's Response to the Kahramanmaraş Earthquake 1EKOS Electric, Turkiye; 2Türkiye Elektrik İletim A.Ş. (TEİAŞ), Turkiye 5:30pm - 5:45pm
Results of the International Survey on Earthquake Damage Experience and Seismic Design of Substations by WG B3.64 1Tokyo Electric Power Company HD, Japan; 2Siemens Energy, Germany; 3CRIEPI, Japan; 4Bonneville Power Administration, USA; 5University of Science and Technology Beijing, China 5:45pm - 6:00pm
Challenges and solutions in the design, erection, testing, commissioning, and Field trials of medium voltage double bus Gas-Insulated Switchgear (GIS BHEL BHOPAL, India |