Conference Time: 8th Sept 2025, 01:56:19am EDT
Conference AgendaOverview and details of the sessions of this conference. Please select a date or location to show only sessions at that day or location. Please select a single session for detailed view (with abstracts and downloads if available).
B3-3: Substation Concepts
Time:
Tuesday, 30/Sept/2025:
1:30pm - 3:30pm
Location: Room 520E
Session Topics:
B3 Substations and electrical installations
Presentations
1:30pm - 1:45pm Emission-free natural-origin gas alternatives to SF6 for MV and HV substations
Mark Kuschel 1 , Hiroyuki Hama2 , Manjunath Ramesh3 , Christophe Preve4 , Thomas Dürr5 , Daniel Schiffbauer6
1 Siemens Energy; 2 Mitsubishi Electric; 3 Nuventura; 4 Schneider Electric; 5 Siemens; 6 Toshiba
1:45pm - 2:00pm Nominal Current Rating of Equipment Connected to Power Transformer Neutral
Olivier Turcotte , Frédérick Dubé, Duong François
Hydro-Québec, Canada
2:00pm - 2:15pm Concepts for on-site HV Testing of GIS after Installation, Extension, Retrofit or Repair
Andreas Laubi 1 , Mark Reuter2 , George Becker3 , Robert Vosse4
1 Aurecon, Australia; 2 Siemens Energy, Germany; 3 Power Engineers, USA; 4 DEP, Netherlands
2:15pm - 2:30pm Investigations on the use of Dry Air as a Retrofill gas Alternative to SF6 in existing Gas Insulated Switchgears
Caterina Toigo 1 , Victor Petit1 , Lydie Cossedu2 , Michael Inversin3 , Vivien Dona2 , Alain Girodet1 , Marie Laure Allard3
1 SuperGrid Institute, France; 2 MasterGrid, France; 3 RTE, France
2:30pm - 2:45pm Advancing Ground Stability: Vibro Stone Columns as an Innovative Solution for Liquefaction Mitigation.
MONA KHANDELWAL , SATYENDRA KUMAR PRASAD, SANJAY SHARMA, ABHAY KUMAR, RAMA MOHAN BURRA VAMSI
POWERGRID CORPORATION OF INDIA LIMITED, India
2:45pm - 3:00pm Upgrading Legacy Feeder Bay Installations to meet Current and Future Network Requirements and Regulatory Compliance for Parallel and In-Line Feeder Configurations Exiting Substations
Shivern Singh
Eskom NTCSA, South Africa
3:00pm - 3:15pm Improvement in Reliability of Substation by In-Situ Replacement of 220 kV Indoor GIS at Tata Power, Mumbai
Dayanand Konduskar 1 , Subhash Vetcha1 , Vidyadhar Ghodekar1 , Balaji Sethuraman1 , Rambabu Katari2
1 The Tata Power Co Ltd, India; 2 Toshiba T&D, India
3:15pm - 3:30pm Enhancing Electrical Substation Safety: A Novel Seasonal Analysis Approach to Soil Resistivity Modelling for Grounding System Design
Jayson Patrick, Edstan Fernandez, Ali Bazaei
ELEK Software, Australia